A simple quote follow-up timeline
Use the days below as a starting point, measured from when you send the quote. Adjust for the project schedule, the customer’s preferred contact method, any promised next step, and the time they asked for. Follow applicable contact rules and your customer’s preferences.
Day 0
Send a clear quote and log it
Confirm the customer, project scope, options, exclusions, price, and any stated timing are accurate. Send the quote through the agreed channel, say what happens next, and record when it was sent.
Day 2
Check that it arrived
After about two business days, send one brief check-in through the customer’s preferred channel. Make it easy to say the quote arrived, ask a question, or request more time.
Day 5
Offer one useful clarification
If there has been no reply, follow up with a specific offer to explain a scope item, option, or next step. Mention only details that are in the actual quote or conversation.
Day 10
Close the loop
Send a short final note saying you will pause routine follow-up. Leave the door open for the customer to restart the conversation, then update the quote’s status in your tracker.
Ready-to-use text examples
Keep a text short, use the channel the customer expects, and ask one easy-to-answer question.
Hi [Customer name], it’s [Your name] with [Business]. I sent the quote for [project] on [date]. Did it come through okay? I’m happy to answer a question or clarify any part of the scope. — [Your name]
Hi [Customer name] — checking in on the [project] quote. Would it help if I walked through [specific scope item or option] or answered a question? If your timing has changed, no problem; let me know what works for you. — [Your name]
Hi [Customer name], I’m closing the loop on the [project] quote for now. If you’d like to discuss it, make a change, or revisit it later, reply here and I’ll pick it back up. Otherwise, no need to respond. — [Your name]
Ready-to-use email examples
Use a recognizable subject and include only information that matches the quote you actually sent.
Subject: Quote for [project] — any questions?
Hi [Customer name], I’m checking that the quote for [project] reached you. It covers [brief, accurate scope detail]. If you have a question or would like me to clarify an option, just reply to this email. Best, [Your name] [Business]
Subject: A question about your [project] quote
Hi [Customer name], I wanted to offer help reviewing the quote for [project]. I can explain [specific included scope, option, or assumption] if that would be useful. If you need more time or your plans have changed, feel free to let me know. Best, [Your name] [Business]
Subject: Closing the loop on your [project] quote
Hi [Customer name], I’m going to pause routine follow-up on the quote for [project]. If you want to revisit it, ask a question, or request an updated scope, reply here and I’ll be glad to continue the conversation. Best, [Your name] [Business]
These are adaptable examples, not messages sent to real customers. Replace every bracketed detail and remove any statement that is not accurate for the specific quote.
Quote-tracking checklist
Keep one current record per quote so the next person can see what was sent and what the customer asked for.
- Customer name and the best contact method they provided.
- Quote or estimate identifier, project address or description, and current version.
- Date sent, quoted scope, options, exclusions, and any stated quote expiration.
- Questions you promised to answer and the next action you agreed on.
- Follow-up dates and the channel used for each attempt.
- Customer replies, requests for more time, opt-outs, or a request to stop.
- Current outcome: open, revising, scheduled, declined, or paused for the customer to restart.
When a customer replies, stop the sequence
Stop scheduled follow-ups as soon as the customer replies. Record the reply, cancel any queued reminders, and respond to what they actually said. If they ask you to check back later, agree on a date and record that preference; do not keep sending the original sequence in the meantime.
More contractor follow-up resources
Examples for electrical projects and estimates.
A practical cadence for HVAC estimates and options.
Follow-up examples for roofing proposals and repairs.
Create an adaptable schedule and draft to review before sending.
Explore an estimate using your own assumptions; results are not a guarantee.